The 5500 litre precast concrete tank Ireland needs for large domestic, agricultural, and commercial sites — engineered and manufactured by Murphy Precast in Enniscorthy, Co. Wexford. At Ø2480mm in diameter and 2855mm tall, weighing in at 5250kg, this three-chamber concrete unit is built to perform for decades without compromise. Twin wall plastic risers. Concrete lid. 4″ inlet and outlet. EPA and Irish Building Regulation compliant. Ready to install the day it arrives.
If you are searching for a 5500 litre precast concrete tank in Ireland with the capacity, build quality, and compliance credentials to meet the demands of a larger site — this is it. Three distinct chambers. Zero plastic compromises. Total peace of mind.
| Specification | Detail |
|---|---|
| Capacity | 5500 litres |
| Diameter | Ø2480mm |
| Overall Height | 2855mm |
| Weight | 5250kg |
| Chambers | 3-chamber — Chamber 1, Chamber 2, Chamber 3 |
| Inlet | 4″ sewer connection (100mm) |
| Outlet | 4″ outlet (100mm) |
| Risers | Twin wall plastic risers |
| Lid | Concrete lid |

Front view — 5500 litre 3-chamber precast concrete tank. Ø2480mm diameter, 2855mm height. Murphy Precast, Enniscorthy, Co. Wexford.
There are concrete tanks and then there are 5500 litre precast concrete tanks built by Murphy Precast. At 5250kg of factory-cast concrete, this unit does not move, does not float, does not degrade, and does not need replacing in ten years. Every chamber, every seal, every measurement has been designed at our Enniscorthy facility and drawn to engineering standard — because that is what large-site wastewater treatment demands.
Three chambers means three stages of primary treatment before any liquid leaves the tank. Chamber 1 handles the initial solids settlement. Chamber 2 continues anaerobic breakdown. Chamber 3 provides a final clarification stage. The result is significantly cleaner effluent entering your percolation area — protecting it and extending its working life.
The twin wall plastic risers bring the access points up to ground level — making inspection and de-sludging straightforward for your registered contractor. The concrete lid provides a robust, durable cover that handles loading from ground traffic above. No compromise on the finish.
Irish winters saturate the ground. Plastic tanks float. At 5250kg, this precast concrete tank does not. Its mass combined with factory-quality construction means it withstands heavy soil pressure, harsh ground conditions, and the full range of Irish weather — for 50 years or more with minimal maintenance.
Delivered from our Enniscorthy factory ready-to-install with integrated lifting points. Your groundworks team prepares the excavation — the tank goes in by crane in a single move. No on-site forming, no pouring, no curing delays. Fast programme. Clean site.
Back view |
Left side view |
A 5500 litre precast tank is specified when a standard 2000 or 3500 litre unit simply does not have the headroom for the site’s wastewater load. The most common customers include:
| Customer Type | Why a 5500 Litre Tank Is Needed |
|---|---|
| Large rural homes and family dwellings | Higher occupancy generates more daily wastewater — the 5500 litre capacity and 3-chamber treatment provides the headroom and treatment quality needed. |
| Agricultural buildings and farm sites | Farm facilities, worker amenities, and ancillary agricultural buildings off mains drainage need robust, compliant on-site treatment. |
| Rural commercial and hospitality premises | B&Bs, holiday lets, small hotels, and rural businesses with variable and higher wastewater flows benefit from the larger capacity and three-stage treatment. |
| Replacement of older undersized systems | Upgrading from a failing or undersized tank? Going to 5500 litres and three chambers future-proofs the installation and reduces servicing frequency. |

Right side view — 5500 litre precast concrete tank. Twin wall plastic risers. Concrete lid. 4″ sewer connection. Drawing ref: MC0050-1-26.
Every Murphy Precast septic tank is manufactured in accordance with EPA guidelines and Irish Building Regulations — the legal framework that governs new-build planning applications and replacement wastewater systems in Ireland. Specifying a compliant tank at the planning stage removes a significant risk from your project.
All domestic wastewater systems in Ireland must also be registered with your local authority. Registration is completed online via
protectourwater.ie
— one-off €50 fee, required within 90 days of commissioning. Failure to register is an offence with a fine of up to €5000.
The
Environmental Protection Agency (EPA)
oversees the National Inspection Plan for domestic wastewater treatment systems in Ireland. Local authorities carry out inspections — using a compliant, factory-made Murphy Precast tank means your system is in the best possible position when an inspector calls.
| Product | Often Specified Together |
|---|---|
| ▶ Precast Water Storage Tanks | Off-mains rural sites often need both wastewater treatment and clean water storage — both available from Murphy Precast. |
| ▶ Precast Effluent Storage Tanks | Agricultural sites needing dedicated effluent storage alongside a wastewater treatment tank — frequently ordered together. |
| ▶ Full Precast Tank Range | Murphy Precast manufacture tanks from 1500 litres to 11000 litres — view the full range to find the right size for your site. |
Every site is different — access, ground conditions, programme timing, and logistics all vary. Contact our Enniscorthy team directly and we will come back to you quickly with the information you need to move forward.
🕕 Old Dublin Road, Kilcannon, Enniscorthy, Co. Wexford Y21AF43
The Murphy Precast 5500 litre precast concrete tank has a diameter of Ø2480mm and an overall height of 2855mm. It weighs 5250kg.
This tank has three chambers — Chamber 1, Chamber 2, and Chamber 3 — providing three stages of primary wastewater treatment. It features twin wall plastic risers, a concrete lid, a 4″ inlet, and a 4″ outlet.
Yes. Murphy Precast tanks are manufactured in accordance with EPA guidelines and Irish Building Regulations — helping ensure the system meets inspection requirements and local authority guidelines for new build planning applications and replacement installations.
A 3-chamber tank provides an additional stage of primary treatment. Chamber 1 handles initial solids settlement, Chamber 2 continues anaerobic breakdown, and Chamber 3 provides a final clarification stage — resulting in cleaner effluent reaching the percolation area and better long-term system performance.
The tank is delivered ready-to-install with integrated lifting points. It is crane-lowered into a pre-prepared excavation by your groundworks team — no on-site forming or curing required. Fast, clean installation.
Call +353 53 923 6348, email [email protected], or use our online contact form. Our team will discuss your site, confirm availability, and advise on logistics for your location.