Precast Bench Bases for Dublin City Council – Designed & Delivered by Murphy Precast

Precast Bench Bases

Overview

Dublin City Council needed a faster, cleaner, and more efficient way to install public park benches across several locations. Traditional installation required pouring concrete on-site, waiting up to 24 hours for it to cure, and then returning later to fix the benches into place. This two-step process increased labour time, project duration, and site disruption.

Murphy Precast, working closely with Hartecast, developed a fully integrated precast bench and base system that could be delivered and installed in a single drop.

The Challenge

  • Reduce on-site labour and installation time

  • Eliminate the need for wet concrete pours

  • Minimise disruption to public spaces

  • Provide a consistent, durable, and safe foundation for park benches

Dublin City Council wanted a solution that would allow benches to be installed as quickly as possible, without requiring multiple site visits or temporary closures of public areas.

The Solution

Murphy Precast engineered a one-piece precast concrete base with the bench already secured into the unit prior to delivery.

Key features of the solution:

  • Bench and base delivered as a single integrated unit

  • “Drop-and-install” design enabling ultra-fast placement

  • No concrete pouring, curing, or return visits

  • Factory-controlled installation ensures safety, accuracy, and long-term durability

  • Consistent finish across all locations

Working in collaboration with Hartecast, the final design was created to meet Dublin City Council’s exact specifications and aesthetic requirements.

The Result

The new precast bench bases significantly improved installation efficiency and site safety while reducing costs and disruption.

Benefits Delivered:

  • Install time reduced from 24+ hours to minutes

  • Zero on-site concrete work required

  • No return visits for adjustments or bench fitting

  • Cleaner, tidier installation in busy public areas

  • Higher quality control with off-site assembly

The project demonstrates Murphy Precast’s ability to engineer practical, time-saving solutions that solve real-world challenges for public-sector clients.